Concord
Infrastructure

Node 0 National Pilot

The Sovereign Standard

Bypassing the $15B Grid Bottleneck.

Project Concord Node 0 is the nation’s first 100MW Auction-Exempt SIU node. Engineered for 120-day speed-to-market, we satisfy the Presidential mandate to "Pay Our Own Way" by generating 100% of our compute load behind-the-meter. We don't ask the grid for permission; we provide the grid with a blueprint for resilience.

The Crisis

Grid Purgatory: Standard data centers face 5-year study queues and multi-billion dollar federal auction liabilities.

The Solution

Zero-Injection Autonomy: Proprietary telemetry ensures 0.00MW export, allowing for a 120-day study bypass.

The Outcome

10x Speed-to-Yield: Capital deploys in months, not decades, securing the lead in the global AGI race.

01. Energy Moat

Island Mode

Zero-Injection Telemetry. Bypassing $15B Fed Power Auction.

02. Strategic Mark

$648 Million

Federal Replacement Value via Jan 16 Presidential Arbitrage.

03. Water Posture

Net-Zero

AWG Hydraulic Fortress. 100% Closed-Loop. Zero municipal consumption.

04. Labor Allocation

$45M Payroll

Fiduciary reservation for IBEW Local 58 PLA.

05. Digital Canopy

Mesh Wi-Fi

Closing the Digital Divide for Host Ward residents at zero cost.

06. Concord Canopy

Food Sovereignty

Server-heated greenhouses providing fresh local produce.

07. Thermal Dividend

$3.5M / Year

Reciprocal heat donation to pre-heat municipal loops.

08. Execution Path

120-Day Launch

Expedited energization via Sovereign Non-Export Protocol.

Live Telemetry Institutional Access [ 7/10 SLOTS CLOSED ]
US Dept. of Commerce DOGE Efficiency Pilot